Lawns: Top dress 5 quarts per 100 sq. ft. Procedure may be repeated after six weeks for added results.
New Lawns: Mix into the top 2" to 3" of the seed bed at the rate of 20 quarts per 100 sq. ft. and mix into soil prior to planting.
Trees & Shrubs: Mix 50/50 with soil when filling around roots. Water thoroughly. Mulching: Apply 2" to 3" on surface around plant in fall for winter protection. Blend into soil and replenish as needed in spring.
Please E-mail or call us at 651-239-1315 for a delivery quote, availability and or any questions.